Production Schedule
Time-based schedule that drives the filling-plan simulation. Generate a sequenced peak-day plan from demand, or edit runs manually.
Active data set
No input data loaded
Upload a project or demand file, or enter data manually to begin analysis.
Planning horizon
Window modelled by the filling-plan simulation. A generated peak-day plan is repeated to fill this period; a mix that overruns a single day is not compressed.
Design parameters
Unusable volume left in a tank before CIP.
Schedule timeline
No runs yet. Generate from demand, add a run, or import a schedule.
Generate from demand builds a sequenced peak-day plan: SKUs that share a syrup on the same line are merged, campaigns run back-to-back at line speed (largest first), and the mix may overrun the production day. Extending the simulation period repeats that peak day until the window is filled.
Production runs
0 runs across 0 lines
| Line | Syrup | Start | End | Rate hL/h | Volume |
|---|